Home / Solutions / Shipbuilding and maritime

Industry

One award,
dozens of modifications

A vessel program runs for years and a single subcontract can accumulate more changes than most companies place awards in a quarter. The record has to survive all of them and still read cleanly.

Modifications kept individuallyLegible at any number
The defining pressure

Volume of change on a single award

Most sectors worry about many awards. Shipbuilding worries about one award changing many times, which is a different problem and breaks different things.

Shipbuilding • Walkthrough

Volume of change on a single award

Most sectors worry about many awards. Shipbuilding worries about one award changing many times, which is a different problem and breaks different things.

  • The record stays legible at any number
  • Funding gaps stay visible across changes
  • Handovers stop losing knowledge
ProcureAudit The record stays legible at any number
Outcome 01

The record stays legible at any number

Whether a subcontract has three modifications or thirty, each reads identically, so the file does not become something only a long serving buyer can navigate.

What that meansA build record that a new program manager can pick up and understand.
ProcureAudit Funding gaps stay visible across changes
Outcome 02

Funding gaps stay visible across changes

With incremental funding across many modifications, the difference between awarded and funded is easy to lose. Holding both per change keeps it in view.

What that meansNo discovery that a modification was underfunded at the point it becomes urgent.
ProcureAudit Handovers stop losing knowledge
Outcome 03

Handovers stop losing knowledge

Over a multi year build the team changes several times. Reasoning captured at each decision means a handover is reading rather than being briefed.

What that meansProgram knowledge that survives every rotation.
Traditional handling against this approach

What happens to a long award over a build

None of these fail immediately. All of them fail somewhere between the third modification and the twentieth.

Book a demo
ProcureAudit A modification log
The challenge

A modification log

Changes recorded in a separate list, maintained by whoever remembers, with no connection to the documents supporting each one.

LocationA separate list
Linked to evidenceNo
At MOD 20Unreliable
ProcureAudit On the award itself
With ProcureAudit

On the award itself

Each modification lives on the award it changes, carrying its own amounts, documents, progress and activity.

LocationThe award
Linked to evidenceDirectly
At MOD 20Unchanged
ProcureAudit Requires somebody who was there
The challenge

Requires somebody who was there

Navigating twenty changes confidently means knowing the history, which restricts the record to a handful of long serving people.

New readerLost
Depends onPeople
RiskConcentrated
ProcureAudit Readable by anybody
With ProcureAudit

Readable by anybody

Each modification reads the same way, so somebody joining in year four can navigate the record without a briefing.

New readerFine
Depends onThe record
RiskSpread
ProcureAudit One figure per change
The challenge

One figure per change

Award and funded amounts get merged, which works until incremental funding across twenty modifications makes the gap impossible to reconstruct.

FiguresOne
GapUnknown
At scaleWorse
ProcureAudit Two figures per change
With ProcureAudit

Two figures per change

Award and funded are held separately on every modification, so the position is visible per change and in total.

FiguresTwo
GapVisible
At scaleSame
ProcureAudit A long briefing
The challenge

A long briefing

Knowledge transfers by conversation, and whatever was not mentioned is lost, which compounds with every rotation over a long build.

MethodConversation
CompletenessPartial
Over 3 rotationsDegraded
ProcureAudit Reading the record
With ProcureAudit

Reading the record

The reasoning and evidence are on the award, so a handover is an introduction rather than a transfer of everything remembered.

MethodThe record
CompletenessFull
Over 3 rotationsUnchanged
Across a build

What thirty changes do to one file

Shipbuilding • Walkthrough

What thirty changes do to one file

Recorded exactly like the first, so the record does not degrade as the build progresses.

  • The twelfth modification
  • A program team rotation
  • A supplier question years in
ProcureAudit The twelfth modification
01

The twelfth modification

Recorded exactly like the first, so the record does not degrade as the build progresses.

Learn more
ProcureAudit A program team rotation
02

A program team rotation

Handover becomes reading the record rather than a briefing that loses whatever went unmentioned.

Learn more
ProcureAudit A supplier question years in
03

A supplier question years in

Answered from the modification the document was filed against rather than deduced.

Learn more
ProcureAudit Funding review across changes
04

Funding review across changes

Award against funded visible per modification rather than reconstructed from a spreadsheet.

Learn more
ProcureAudit A package is resequenced
05

A package is resequenced

The affected modifications carry their own progress, so what moved and what did not stays separable.

Learn more
ProcureAudit Yard and subcontractor documents
06

Yard and subcontractor documents

Tracked to expiry against the supplier rather than rechecked package by package.

Learn more
What each change carries

Six fields that let a modification stand alone

ProcureAudit Award amount
01

Award amount

What was agreed for this change, separate from the parent and every other modification.

ProcureAudit Funded amount
02

Funded amount

What money is behind it, which under incremental funding is frequently less.

ProcureAudit Its own progress
03

Its own progress

Completion for this change rather than a figure blended across the whole award.

ProcureAudit Its own documents
04

Its own documents

Evidence filed against the change it supports.

ProcureAudit Its own approvals
05

Its own approvals

Who signed off on this change specifically, with the date.

ProcureAudit Its own activity
06

Its own activity

A timeline for this modification rather than for the award as a whole.

FAQ

Questions from shipbuilding and maritime contractors

A single award can have dozens of changes. Does that work?
It is the case modification handling is designed for. Each change carries its own record, so the twentieth reads exactly like the first and the file stays navigable.
How do we track incremental funding across many modifications?
Award and funded amounts are held separately on each change, so the gap is visible per modification and in aggregate rather than reconstructed later.
What happens across team rotations?
Nothing to the record. Reasoning is written at each decision, so a new program manager reads the file rather than being briefed on what somebody remembers.
Can documents be filed against a specific change?
Yes, and that is the point. Evidence attaches to the modification it supports, with the parent award linking through to each one.
Do you handle both prime and subcontractor positions?
Yes. Shipbuilders are usually both, and a purchasing file has the same shape whichever direction the award came from.
How long does the record stay readable?
As long as your retention requires. Because it is built as the program runs rather than assembled at delivery, old records read the same as recent ones.
Can different packages carry different checklists?
Yes. Templates are built per award type, so a major structural package can require more evidence than a routine supply award.
More solutions

Other sectors and roles worth reading

ProcureAudit Aerospace and aviation
SOLUTION

Aerospace and aviation

Long lead awards that stay readable for years.

Learn more
ProcureAudit Manufacturing and industrial base
SOLUTION

Manufacturing and industrial base

Production purchasing where records and awards move at different speeds.

Learn more
ProcureAudit Program managers
SOLUTION

Program managers

Subcontract progress across a program without chasing individuals.

Learn more

Bring a subcontract with a dozen changes

Ideally one that has become difficult to read. We will show what it looks like with each modification standing on its own.

Book a demo